Predictive maintenance for cement and building materials production

A crusher cyclone, a rotary kiln or a cement mill has no process pause: production is built on moving large masses of material continuously through heavy rotating equipment that runs in constant dust and high temperatures. Misoki helps you see wear on an asset before it stops the kiln or the grinding line.

What Prism detects
Prism AICement & aggregates
Typical assetsCrushers, raw and cement mills, the kiln's main drive, clinker-cooler fans.
What Prism catchesKiln ring-gear wear and abrasive fan-blade erosion in a heavily dust-laden airflow.

Monitoring equipment that runs in the toughest production conditions

Cement plants and aggregate quarries share one thing: equipment here handles abrasive, dusty material and still has to run continuously for months without stopping. You cannot "slow the kiln down a little" for a check: stopping it and bringing it back to operating conditions costs days of downtime and a lot of fuel to heat it up again.

Prism AI tracks the condition of crusher, mill, fan and conveyor drives with data collected continuously and recognises a developing defect long before it shows up as an emergency stop. This gives the maintenance team time to choose when to intervene, for example during a scheduled kiln shutdown for refractory lining repair, instead of a separate unplanned stop. A certified vibration analyst confirms significant findings, so the production manager gets a specific conclusion about the asset, the cause and the urgency.

Misoki works on any rotating asset on your site

Here is what teams monitor most often:

  • Jaw, cone and impact crusher drives
  • Raw and cement mills (ball, roller)
  • Main and auxiliary drives of the rotary kiln
  • Clinker grate cooler fans
  • Kiln and mill draft fans (ID/PA fans)
  • Conveyor drives for raw material and clinker transport
  • Screen and vibrating sieve drives
  • Pumps for conditioning and dust collection systems
  • Compressors for pneumatic conveying and aspiration systems
  • Silo extractor and feeder drives
  • Drives of packing and loading systems for finished product
  • Quarry crushing and screening plant equipment (crushed stone, sand)

What the Prism AI assistant detects

  • Wear of the girth gear and pinion on rotary kiln and mill drives
  • Abrasive wear of fan blades caused by heavy dust in the gas stream
  • Crusher bearing defects under impact loads during crushing
  • Imbalance and loose mounting of heavy rotating conveyor assemblies
  • Misalignment of the drive train of the main kiln drive
  • Electrical faults in high-power drive motors (current and voltage analysis)
  • Thermal deviations in bearing assemblies near the hot zone of the kiln and clinker cooler
  • Resonance in long conveyor galleries for raw material transport
  • Bearing lubrication problems in heavy dust and high temperatures

What Misoki solves for your team

Very high cost of a kiln stop

An unplanned rotary kiln stop costs days of downtime and fuel to heat it up again. Early detection gives time to plan the intervention together with the next scheduled shutdown.

Extremely dusty and hot environment

Conditions near the kiln and crushers destroy ordinary measuring equipment. Our hardware is designed for continuous operation in these conditions.

Abrasive wear on equipment

Raw material and clinker speed up wear on blades, lining and bearings. We track this wear before it becomes critical.

A large fleet of similar equipment at the quarry and plant

Dozens of similar crushers, conveyors and fans make manual rounds difficult. Prism itself identifies which asset needs attention first.

Quarries far from technical expertise

Not every site has a vibration analyst on staff. We provide this expertise remotely.

Secondary damage to adjacent equipment

When one drive in the process chain fails, it often damages the assets next to it. Early warning lowers the risk of such a cascade.

Integration with your existing systems

At a cement plant, the kiln and grinding process is already controlled by an automation system (PLC/DCS), and clinker and cement quality is tracked by the laboratory quality control system. Misoki does not take over or duplicate that role: the platform adds a layer that usually was not there, the continuous condition of the rotating equipment itself, and when needed matches it with the kiln operating parameters the automation system already records, to tell a mechanical fault from a temporary change in operating mode.

If a quarry or plant already has third-party vibration monitoring equipment on individual crushers or mills, we connect to it directly instead of asking you to remove it. Confirmed findings can be passed to the site's CMMS as a planned repair work order. For sites with limited or unstable network connectivity (typical for quarries), deployment on local on-premises infrastructure is available.

How it works day to day.

The plant's maintenance team traditionally learns the real condition of a kiln or mill drive only during the shutdown itself, once the equipment is already stripped down. Misoki moves that point of knowledge much earlier: a shift supervisor sees the condition of every monitored asset on a panel well ahead of the next scheduled shutdown and can draw up a work list in advance instead of improvising on site.

When Prism flags a developing defect, on a mill's ring gear, say, or a clinker-cooler fan bearing, the finding answers the key question straight away: will the asset last until the planned kiln shutdown, or does it need attention now. That turns a major overhaul from "strip it down and see what's broken" into "arrive with a ready list of parts and tasks," which directly shortens the shutdown itself.

Minimise downtime. Keep operations running.

  • Fewer unplanned stops of the rotary kiln and grinding line
  • Less lost time reheating the kiln after unplanned shutdowns
  • Precise identification of the problem asset among a large fleet of similar crushers, mills and conveyors
  • The ability to prepare a repair work list in advance, ahead of the next scheduled shutdown
  • Lower risk of secondary damage to adjacent equipment in the process chain
  • A long-term equipment wear history to plan major overhauls and modernisation

See what Prism finds on your machines.

Send us a week of data from one machine and we walk you through the diagnosis.